Torbido Tunnel Reopened to Traffic

January 13, 2026|

The structural restoration and water infiltration repair works in the Torbido Tunnel, at km 22+800 of the SS 682 Jonio-Tirreno, have been completed. The executive project, developed by Cooprogetti Soc. Coop., has ensured greater safety [...]