Awarded the final and executive design and execution of works for the construction of the first line in Italy of the BRT, Bus Rapid Transit, Pievaiola – Settevalli route (Castel del Piano – Fontivegge line) in Perugia financed by the Next Generation EU, Measure M2C” 4.2 of the National Recovery and Resilience Plan – PNRR. The integrated contract was awarded to a grouping of firms led by TECNOSTRADE S.R.L, SPINELLI E MANNOCCHI S.R.L., CONSORZIO STABILE C.S.I. – CONSORZIO SERVIZI INTEGRATI SOCIETÀ CONSORTILE A RESPONSABILITÀ LIMITATA, CALZONI SPA, TODINI COSTRUZIONI GENERALI S.P.A. for achieving the best overall score on the technical bid and with an economic rebate of 13.310 percent. The design will be coordinated by RPA S.r.l., and conducted together with NET Engineering S.r.l., E.T.S. S.p.A. and Cooprogetti Soc. Coop.
Perugia Today