Adaptation of the purification plant of Casa del Lupo
The interventions for the adaptation at the purification plant of Casa del Lupo consist of new pretreatments (Screen lifting desalination, micropollutant treatment); a new Water Line with primary sedimentation, biological lines with Alternating Cycles, secondary sedimentation, filtration on canvas and disinfection; a portion of the new sludge line consisting of static thickening, dynamic thickening, dehydration; and a new access to the plant via a bridge over the Frizzone stream. Increase in hydraulic flow rate from 1670 m3/h to 2300 m3/h.