client

Ministry of Infrastructure Interregional Superintendency for Public Works Campania – Molise

location

Porcari (LU), Toscana, Italia

status

2019 Ongoing

budget

16,998,961.46 €

scope

Construction management and EHS management

Adaptation of the purification plant of Casa del Lupo

The interventions for the adaptation at the purification plant of Casa del Lupo consist of new pretreatments (Screen lifting desalination, micropollutant treatment); a new Water Line with primary sedimentation, biological lines with Alternating Cycles, secondary sedimentation, filtration on canvas and disinfection; a portion of the new sludge line consisting of static thickening, dynamic thickening, dehydration; and a new access to the plant via a bridge over the Frizzone stream. Increase in hydraulic flow rate from 1670 m3/h to 2300 m3/h.

expertise

buildings

infrastructures

environment

territorial and
agronomic systems

buildings

infrastructures

environment

territorial and
agronomic systems